PRODUCED EMULSION & BOILER FEED WATER PIPELINE REPLACEMENT PROJECT

The Produced Emulsion (PE) and Boiler Feed Water (BFW) Replacement Project is to replace the existing PE and BFW pipeline running from the client’s well pad facilities to the Central Processing Facility (CPF). The project is the first pipeline utilizing pipe in pipe technology (PIP) in the SAGD industry.